Wrexham MBT Plant

Mechanical Treatment (MT)

The mechanical treatment process consists of a front-end reception area where Council kerbside collection vehicles deliver municipal solid waste (MSW) from the Wrexham residents and some commercial properties. Third party waste is also received and stored within this area.

The MSW received is loaded into a feed hopper by a mechanical loader and processed through the mechanical sorting equipment.

The MT process recovers recyclables from waste material that have been incorrectly segregated at source. After recovery the remaining waste is conveyed to the biological treatment (BT) process.

The recyclable materials are bulked up loose or baled before being transported to re-processors for recycling.

Biological Treatment (BT)

The biological treatment (BT) process consists of five bio-drying tunnels. After recovery process, the remaining waste is conveyed to interim storage bays, where it is transferred to the bio-drying tunnels by a front-end loading shovel. The waste is bio-dried for up to 2 weeks via aerobic composting to remove excess moisture from the material and prepare the waste for conversion to residual derived material (RDF).

Once the bio-drying process is complete, the waste is removed from the tunnels and loaded into a hopper that feeds the refinement process. RDF will be produced to a designated specification.

In the refinement process, aggregates are removed for further recycling. RDF material is loaded into bulk haulage vehicles and transported to an Energy from Waste (EfW) facility which generates green renewable power in the form of electricity. You can find out more about the Ferrybridge EfW at their website.

Biological Treatment (BT)

Gallery

MBT
Control centre
MBT
MSW ready for processing
MBT
Waste being mechanically processed
MBT
Metal mechanically removed from waste
MBT
Baled plastic ready for further processing
MBT MBT MBT MBT MBT